Reader's Response
In
the article “Use of cladding in buildings here have grown in recent times”
Mokhtar (2017), reported that although there are benefits of cladding installed
on a building, cladding is still a fire hazard.
It is reported that the usage
of cladding has shown to provide many benefits for the building, such as heat
insulation and the reduction in energy consumption (Fadeyi 2017). However,
cladding has contributed in rapid spreading of fire as air is sucked into the
ventilation gaps due to pressure, which could escalate a fire (Budig, 2017).
According
to the Singapore Civil Defence Force (SCDF), the ‘Singapore Fire Code’
regulates that the materials to be used in construction must meet the class ‘0’
requirement, which is defined that a fire will not spread when a material is
ignited. These materials are required to adhere to local certification, which
includes timely testing to ensure that there is no deviation from the
requirement.
Although
there are strict regulations in Singapore regarding fire safety, such as the
‘Singapore Fire Code’, there are existing buildings in Singapore with cladding
which fail to meet the guidelines. A change in the checking and testing
conducted on the material is required to ensure that the correct material is
used for cladding.
“How
did cladding woes happen despite layers of checks?”, Ng (2017), reported that
the main cause for the non-compliance was directly from the source material,
where the main material used for cladding was mixed with another material,
which was non-compliant.
In
the pre-construction phase, the materials are tested for the fire rating in
batch samples at a certified laboratory, which will provide a certificate of
conformity stating the matching serial numbers stamped onto the material. The
certificate will be collected by the supplier, which will subsequently be given
to the project architect.
In
the construction phase, after the project is sanctioned by the architect, the
cladding is delivered to the site, which will be checked by engineers to ensure
that the materials are correct, as well as SCDF inspectors, who will provide a
temporary fire permit. A contractor is often hired to install the cladding, who
will then provide a separate acknowledgement of conformity.
In
the post-construction phase, a certified external inspector is required to
counter check the certificate of conformity, along with SCDF, which will then
grant a fire safety certificate.
However,
reported in the article “36 buildings may have combustible cladding that
doesn't meet safety standards”, (Loh, 2017), 36 buildings were subjected to
scrutiny, out of which 14 building were found to have cladding which failed to
comply with the class ‘0’ regulation. These 14 buildings evidently show that
even with despite strict regulations and checks, it has been unable to prevent
a mix up of non-compliant material.
Although
there are multiple checks done throughout the construction process, the
material was only tested as a sample in the initial phase of construction. As the
focus of the checks done by the multiple parties were to ensure that the
material number matches the certificate of conformity, if the initial material
had passed the laboratory testing despite being non-compliant, the subsequent
checks would not have detected any abnormalities with the material.
A
change of the material test to bench-scale testing will help resolve the
problem of contaminated material. ‘Reduced-scale methods’ can be adopted to
better test the material, as research has shown ‘good correlation’ with the
full-scale tests, which provides a better gauge of the material’s fire rating
(Wade & Clampett, 2000), as compared to sample batch
testing. Additionally, the material should be tested by another
credited laboratory, to ensure that there is consistency in the laboratory
results. By changing the testing methods, it could have detected the mix up of
the material at the supplier’s warehouse, which would prevent this incident
from occurring. Thus, with improved laboratory testing, the opportunity for
incorrect material used in construction will be greatly reduced.
References
Mokhtar, F. (2017, June 17). Use
of cladding in buildings here have grown in recent times: Experts. Retrieved
from http://www.todayonline.com/singapore/use-cladding-buildings-here-have-grown-recent-times-experts
Loh,
C. J. (2017, August 25). 36 buildings may have combustible cladding that
doesn’t meet safety standards; police investigating. Retrieved from http://www.channelnewsasia.com/news/singapore/36-buildings-may-have-combustible-cladding-that-doesn-t-meet-9153588
Ng, J. S. (2017, August 25). How did cladding woes happen
despite layers of checks? Retrieved from http://www.straitstimes.com/singapore/distributor-placed-two-models-of-cladding-in-one-stock
Wade, C. A. & Clampett, J. C. (2000, April). Fire
performance of external cladding (PDF). Branz. Retrieved from https://www.google.com.sg/url?sa=t&rct=j&q=&esrc=s&source=web&cd=10&cad=rja&uact=8&ved=0ahUKEwjvkun01u3WAhUBGpQKHWIrBZ0QFghNMAk&url=https%3A%2F%2Fwww.abcb.gov.au%2F-%2Fmedia%2FFiles%2FResources%2FResearch%2FFCRC-PR-00-03-Fire-Performance-Exterior-Claddings.pdf&usg=AOvVaw3Gado4h7LpFOPrEHnHXxP7